1、搅拌车液压传动系统液压油的压力、油量、油质、油温应达到规定要求,无渗漏现象
1. The pressure, oil quantity, oil quality and oil temperature of the hydraulic transmission system of the mixer shall meet the specified requirements without leakage
2、搅拌运输中,装载混凝土量不能超过允许装载质量。
2. During mixing and transportation, the amount of concrete loaded shall not exceed the allowable loading mass.
3、搅拌车在露天停放时,装料前应先将搅拌筒反转,使筒内的积水和杂物排出。装料前,需要先向筒内加水,使进料流畅,防止粘料。
3. When the mixer truck is parked in the open air, the mixing drum shall be reversed before loading to discharge the ponding and sundries in the drum. Before loading, it is necessary to add water into the cylinder to make the feeding smooth and prevent sticking.
4、搅拌车行驶中,接长的卸料槽要翻转后固定在卸槽上,再转至与车身垂直部位,用销轴与机架固定,防止由于不固定而引起摆动,打伤行人或影响车辆运行。
4. During the driving of the mixer truck, the extended discharge chute shall be turned over and fixed on the discharge chute, then turned to the position perpendicular to the vehicle body, and fixed with the frame with a pin shaft to prevent swinging caused by non fixation, injuring pedestrians or affecting the operation of the vehicle.
5、搅拌车通过桥、洞、库等设施时,应注意通过高度及宽度,以免发生碰撞事故。特别需要注意的是现在四轴罐车的长度很长,在通过桥洞高度接近顶端时,长长的车身是下圆弧路面的一道弦,能通过的高度会降低。
5. When the mixer truck passes through bridges, tunnels, warehouses and other facilities, pay attention to the passing height and width to avoid collision accidents. In particular, it should be noted that the length of the four axle tank car is very long. When the height of passing through the bridge opening is close to the top, the long body is a string of the lower arc road surface, and the passing height will be reduced.
6、搅拌装置连续运转时间不超过8h。
6. The continuous operation time of the mixing device shall not exceed 8h.
7、搅拌车运送混凝土的时间不得超过搅拌车规定的时间,以免影响混凝土质量。
7. The time for transporting concrete by the mixer truck shall not exceed the time specified by the mixer truck, so as not to affect the concrete quality.
8、运送混凝土途中,搅拌筒不得停转,以防混凝土产生初凝及离析现象。
8. During the transportation of concrete, the mixing drum shall not stop to prevent initial setting and segregation of concrete.
9、搅拌筒由正转变为反转时,先将操纵手柄放置中间位置,待搅拌筒停转后,再将操纵手柄放置反转位置。
9. When the mixing drum changes from positive to reverse, first place the control handle in the middle position, and then place the control handle in the reverse position after the mixing drum stops.
10、水箱的水量要尽量保持装满,以防急用。冬季停车时,要将水箱和供水系统的水放净。
10. The water tank shall be kept full to prevent emergency use. When parking in winter, drain the water from the water tank and water supply system.
本文由
全自动上料搅拌车友情奉献.更多有关的知识请点击:
真诚的态度.为您提供为全面的服务.更多有关的知识我们将会陆续向大家奉献.敬请期待.
This article is dedicated by the full-automatic feeding mixer truck. For more information, please click: Sincere attitude. To provide you with a comprehensive service. More relevant knowledge, we will continue to offer to you. Please look forward to it